Sunday, May 3, 2009

ROOF TRUSSES




From the outside the progress this week doesn't look as dramatic as the previous 2 or 3 but things are still moving along despite the cold wet weather.
The most noticeable addition are the roof trusses but also the plumbers came in to do their 'rough in' which has all the hot n cold water lines, waste pipes and gas lines in.
We also had an independent inspection carried which has highlighted a few issues particularly with the steel work so will be following that up.
Here's this week photo - although a little dark you can see double timber columns at the front that will sit on the brick columns. There is a 3rd one just out of shot to the left. The gable at top front is taking shape.
The 6 wide stud in the garage is temporary as the beam that will eventually span the openning sits on brick columns (yet to be constructed).
oh and of course another apearance of the Small Geelong Supporter (SGS) laying claim to a bedroom apparantly?