Thursday, August 18, 2011

TV wall points

ANTENNAS INSTALLED TODAY - PH.0409 888 228
A guy came in and installed the antenna and 2 points which matched the electrical outlet on the left (click on cover), all good.
I then called them back a year later to install the remaining 6 points and a different bloke turned up and installed different face plates as per the photo. They are also a different shade of white.
Unfortunately I didn't notice the difference untill I'd paid and now they refuse to change them saying "you should have told us you wanted them to match" - real smart.
I won't be recommending Antennas Installed Today to anyone - Fail



Crap workmanship


It's time we started outing some of the shit tradies / workmanship / business's that we've encounted whilst building this house and we've had quite a few thru the front door.

We still have pending action, so outing those will follow with time.


Wednesday, November 11, 2009

TURF

I took the day before cup day off and had some turf delivered. We went with Kikuyu which is what we had at our last place, it's agressive growing so is good with kids and dog and is also at it's best in summer.
We had plenty of helpers and we were all knackered at the end of the day.



I got the tank pump running and we've been watering it in since.



Unfortunately we are now into 'the hotest period for November on record in Melbourne' with the entire week being above 30 deg and posible relief next Monday before being back to above 30!!! So we're now rationing the tank water.

Thursday, November 5, 2009

UNPACKING

We've moved into the house although there is still alot of work to do.
To start with we haven't got our phone or internet connection yet hence the lack of comunication.
Last week we got the last of the electrical stuff finished so all the lights work and the central vac (the vacpan is Ritas favourite toy at the moment.)
The garage is still full of stuff so we'll need to put up some shelves out there to organise things.
My Mum and Dad have been staying with us and have been a great help.
I've attached a few photos of the family / kitchen / dining area.

Sunday, October 25, 2009

WE'RE IN

Yes we're in. No phone or internet connection yet.
Photos to follow

Thursday, October 15, 2009

FLOORING


As predicted this week has been a busy week. Busy but productive - a bit of project management and it amazing what you can get done in a short space of time.

Monday the carpet was laid upstairs. A friend suggested we wouldn't do better than Fowles Austions and they were right (so far). The young guy who laid it was very good.

Tuesday & Wednesday we had the timber 'engineered flooring' laid which wasn't too bad. We used a system called Readyflor Uniclic that uses a patented tongue n grove system that requires no glueing. The variety is 'blackbutt' Australian hardwood - see photo.

The painters have been in all week but the rain has beaten them before they could paint the last of the outside items. We still have the crappy buff paint on the upper weatherboards - legal action pending.

Sunday, October 11, 2009

HAND OVER

Thats right on Friday we had our hand over where the house is now our responsibilty.
It was a bit of an anticlimax as there are still so many little niggly things to be done.
It was a quiet week at the house except for Friday? So as a result we'll have to have the painter, the electricain, the lock smith, the plumber and the chippy all back to finish things also we have no gas or phone connection, the fence, the toilet, the excess concrete has to be removed and of course the upstairs cladding is still painted that shitty mustard colour.
So this week I've organised Carpet Monday, Timber flooring Tuesday & Wednesday, Skirtings Thursday, Appliances Friday, move Saturday - Sunday. I need to get a dingo to clean out the driveway and get some crushed rock so we can get a truck in.
Oh and work as well

Sunday, October 4, 2009

THE LAST INSTALLATIONS

Getting close now. This week saw the installation of the showers and mirrors. Rob has also finished the shelving, put all the door handles on and weather strips.

Really the bathrooms are about done so here is a photo of each
Main bathroom
Master en-suite
Guest room en-suite
Down stairs toilet
...and the laundry minus the drier and washing machine.

Tuesday, September 29, 2009

FIT OFF

The last couple of weeks we have had the tradies doing their fit-offs.

The plumbers had a bit of trouble fitting the taps we supplied to the basins although they all came from the same plumbing supplies.

The Electricians fitted the ceiling fans (all 8 of them) and found most of the wires in the wall.

The ducted heating tech had to cut a couple of holes in the upstairs floor to find his ducts.

I've attached a couple of photos of the kitchen splash backs (or lack of in the case of the south wall). Lesson learnt is make sure the lousy Architects draw an elevation of the kitchen. We would have realised that the window was too big which sacrificed our splash back leaving a section on the left side and a ridiculous 10mm strip of red glass on the right.








... and what about those mighty Cats?

Sunday, September 20, 2009

Sunday, September 13, 2009

TILING

Things are moving very slowly now as I think 95% of the payments have been made (and the last 5% probably is owed to tradies anyway).
The tiler is in residence at the moment and seems to be doing a good job. The painter has finished inside (we made sure he had the right colour by sticking a sample card to the wall)
We have been busy sorting out flooring and have booked them in for early October after consulting with our SS (I feel this date may be optimistic but we'll push to have the builder out by then)
Whats more after 2 weeks in the ground our 7000 litre tank is full to the top!!!

Saturday, August 29, 2009

WATER TANK

After a lot of planning and with great relief our 7000L tank is now safely in the ground.

We'd had a shocking wet and windy week but Friday was a nice fine day.
We started at 7:00am digging the 3m deep hole in the front yard. The depth was at the limit of excavators reach.
After a lot of juggling stockpiles and a couple of trips to the tip we were ready for the concrete tank by about 12:30.
The truck backed across the kerb, up to the hole and craned the 9 tonnes of tank and lid straight in with absolute precision.
After back filling around the tank with crushed rock it was up to the plumber to connect up the inflow from the down pipes and the overflow out to the street.
We were all finished by about 4pm which just left me to clean up the street, naturestrip and footpath. We'll connect the pump, float and rainsaver closer to move in date to prevent them 'going missing'.
We previously plumbed the house with a seperate tankwater line feeding the downstairs toilets and the washing machine. For now they are charged from the mains.
It all ran smooth thanks to Dave and his excavator, Frankston Concrete Products who supplied, delivered and craned in the tank (and pump etc) and John from John Henderson Plumbing (Geelong) who ran the show.

Tuesday, August 18, 2009

CABINETS

This weeks addition to the house are the cabinets made by Harnett Cabinets who have been really good with their comunication and ensuring things run smoothly.



The first 2 photos are of the kitchen with a nice wide space between the wall bench and the big island bench.
The island bench is a 3.0m x 0.9m slab of ceaser stone which is as long as they make with no joins. It doesn't have the sink in it either and will have a 300mm over hang as a breakfast bar.





The other photo is of a typical bathroom cabinet, benchtop, basin. The basins replace the original display home basins. We found these at Tradelink and they were cheaper, bigger and deeper and don't require a tall tower mixer. The mixer comes out of the basin instead of from the bench top.

Tuesday, August 11, 2009

INSIDE & OUTSIDE STUFF



Last week and this week Rob the carpenter has been on-site hanging doors and preparing skirtings etc. It's amazing how many internal doors there are. The photo right is taken from the family room looking at kitchen left, fridge recess & hall centre, dining area right.
The big addition last week
were STAIRS!!!



There was more preparation for the under ground water tank last weekend. I'm a little concerned about the amount of ground water (as can be seen in the photo) and whether my tank will stay under ground or bob to the surface? Anyone know a good civil engineer?

No doubt the rain will stop as soon as the tank is installed and need to be filled.

Monday, August 3, 2009

PLASTERING


I've been a bit slack with the posts of late but here is an update.

Last week the plasterers spent the week 'walling in' and by the end of the week the external doors were hung and we were locked up (or locked out). The 'lock up' payment was actually made the week before as the contract definition of 'lock up' doesn't include doors?

Currently the renderers are working on the facade.
As you can see we haven't resolved our colour disagreement yet.

I have spent the last 2 weeks preparing the front 'set-back' so we can install an underground water tank which has involved moving a few things to make room.

Sunday, July 19, 2009

NASTY NEIGHBOURS

First it was the bloke from down the street now we find that we are living next door to what may turn out to be the neighbour from hell.
Our neighbours son (30 -40 y.o.) yelled at me to stop hammering (inside my roof space) as he was trying to sleep at 4:45 Saturday afternoon. So I did.
This morning I got to the house at 10:15 and began moving the bricks in my front yard to make way for a in-ground water tank we plan to put in, next thing he leans over the fence yelling and screaming ordering me to stop making noise. I told him to calm down, stop swearing at which point he ripped the trellis off the top of the fence and stormed off.
It has sort of taken a bit of the shine off looking forward to moving in. We are a bit scared what he may do next.

Sunday, July 12, 2009

TOWARDS LOCKUP

A week of wet weather stalled things at the house but things have started moving again. Since my last post the ducted heater and ducting has gone in along with the electrical wiring, ducted vacuum and most of the insulation. John and I put in all the data cable, surround sound cables, foxtel cable and extra phone and TV points over the weekend.
We also went out and bought a fire place and 8 ceiling fans so the credit card is maxed out.
We are still have a couple of issues with the builder that have yet to be resolved. (one being who is going to pay for the repaint).
The roofer has finally turned up to finish the roof on the single story parts of the house which will trigger the lock-up payment (a big one).

Sunday, June 28, 2009

PAINTING PROBLEMS




Here is a lesson to others choosing paint colours. Dulux 'buff' and Dulux 'buff it' are 2 totally different colours. We now know this. I suspect 'buff' is an old colour as it doesn't come up on the dulux web site search as a current colour - in-fact it directs you to 'buff it' which is the colour we wanted. Despite this the painter managed to find the wrong one.
For the record the colour in the photo is Dulux 'buff' and we hate it.

Sunday, June 21, 2009

WEATHERBOARDS






This week the weatherboards have been going up and are nearly finished apart from being sealed and painted.
Rita quite likes the unpainted colour of the cement sheet boards. The final colour will be dulux buff which is not too dissimilar. (see above)
Also on Friday they started on the infill for the gable up top which was one of our additions to the facade. (it matches quite a number of houses in our area)
Happy Birthday to Ben (the 'Small Geelong Supporter' for those who have been following from the first couple of posts). He turned nine.

Tuesday, June 16, 2009

HOUSE OF SCAFFOLDING


Look beyond all the scaffolding and fence and you can see the house taking shape.

The last couple of weeks have been cold and wet and it would have been nice to have things closed up.

Recent progress has been the sofit under the eaves on the upper roof and now the weatherboards have started on the north wall.